Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /var/www/vhosts/lifeartina.eu/httpdocs/wp-content/plugins/revslider/includes/operations.class.php on line 2854

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /var/www/vhosts/lifeartina.eu/httpdocs/wp-content/plugins/revslider/includes/operations.class.php on line 2858

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /var/www/vhosts/lifeartina.eu/httpdocs/wp-content/plugins/revslider/includes/output.class.php on line 3708

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-maximum-upload-file-size domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/lifeartina.eu/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the logo-showcase-with-slick-slider domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/lifeartina.eu/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/lifeartina.eu/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/lifeartina.eu/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the goodlayers-core domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/lifeartina.eu/httpdocs/wp-includes/functions.php on line 6114
MARINE LITTER MONITORING – Life Artina

MARINE LITTER MONITORING

Author: A. Paradinović

After a Labor day, on May 2 we headed to Lastovo to do marine litter monitoring. As part of this project activity, three field researches have been done so far, and this was the last, the fourth. According to the protocol, we did marine litter monitoring on the beaches of Sito, Kremena and Saplun, and sea transects in the southeastern and western waters around the Lastovo Islands. On the beaches in the given area, waste was collected, sorted by categories, and the number, origin and mass of each type of waste was recorded. On sea transects, along precisely defined routes, the sea surface is observed from the ship and the quantity and type of floating waste in the sea was recorded.

Sorting collected marine litter (Author: F. Dokoza)

What we noticed was that there were a lot of tiny pieces of plastic and microplastics on Kremena beach, while there was a larger amount of medical waste on Saplun beach. At Sito beach we were greeted by an unpleasant surprise and a huge amount of plastic waste.

Litter on the beach (AUthor: A. Paradinović)

5 days of field work passed quickly and we returned to Split, and now the processing of the collected data follows. Although this is our last monitoring within the project, we hope that they will be implemented in the future, and that the amount of recorded waste will be reduced. Based on the data collected, a detailed analysis will be made by which effective mitigation measures will be determined and proposed.